![]() It was the same path that was to be used as it was put in place to serve as a crane way. They are two large beams inclined in the same direction as the crossbow, having a height of 1.30 m, and are like the gigantic rails of the track followed by the elevator cabins. ![]() ![]() We have seen that inside each upright and above the crossbow closest to the center of the tower are the elevator paths. Guyenet, engineer-builder, according to the program that we had traced to him. They were studied with great care and carried out with rare success by Mr. ![]() For the assembly of the parts from the base for the pile 3 and from the second panel for the others, we used special cranes, which require that we stop there rather long, because they were used until the completion of the works and they rendered us the greatest services. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |